Consulting Services


Bond Release

  • Bond Release Management & Facilitation
  • Bond Agreement Preparation
  • Bond Extensions
  • Bond Reductions
  • Bond Tracking & Management
  • Street Acceptance Packages
  • Easement/Quitclaim Coordination
  • Site Punch List Creation
  • Punch Work Execution
  • PE Sealed Documents


Permit Expediting

  • Building Permits
  • Permit Applications
  • Plan Submission/Tracking/Reporting
  • Site Plan Permit Processing
  • Permit Close Out
  • Right-of-Way & Public Space Permits
  • Raze Permits
  • Sheeting & Shoring Permits
  • Foundation to Grade Permits
  • Tenant Layout Permits
  • Excavation Permits
  • Demolition Permits
  • Certificate of Occupancy 
  • Traffic Control/MOT Permits & Plans


Dry Utility Design & Coordination

  • Dry Utility Studies
  • Initial Evaluation/Cost Estimates
  • Subsurface Utility Engineering/Designating
  • Dry Utility Planning/Design/Coordination
  • Demolition Disconnects & Relocations
  • Pepco Structural Facility Drawings (SFD)
  • Conduit Plan Design
  • Easement Coordination
  • Construction Administration


Environmental Compliance

  • Stormwater Compliance
    • Stormwater Pollution Prevention Plan (SWPPP) Preparation
    • Stormwater Pollution Prevention Plan (SWPPP) Inspections
    • Erosion & Sediment Control Inspections
    • Stormwater Facility Construction Inspections
    • Stormwater Facility As-Built Certifications
    • Stormwater Permits Closeout/Notice of Terminations
  • Wastewater Compliance
    • Wastewater Monitoring/Sampling/Reporting
    • Regulatory Analysis and Related Support
  • Stormwater Facility Inspections and Maintenance
  • Wetlands Identification and Delineation
  • Bathymetric Survey
  • Water Quality Assessments
  • Environmental Site Assessments (Phase 1 & 2)


Traffic Control Plans

  • Maintenance of Traffic (MOT) Plan Design
  • Maintenance of Traffic (MOT) Permits
  • Traffic Control (MOT) CAD Drafting


Red Tape Due Diligence

  • Building Permit Study
  • Zoning Municipality Confirmation Letter 
  • Dry Utility Study
  • Environmental Site Assessments: Phase I, II, & III
  • Surface Water Condition Assessment
  • Wetlands Identification 
  • Wetlands Permitting
  • Water Quality Assessment
  • Water Quality Certification
  • Endangered Species Determination
  • Property Condition Assessment (PCA)